Installing the CS800 System in the Rack Installing the ETERNUS CS800 Components
50 U41842-J-Z125-1-76
6. Fit the PRIMECENTER/DataCenter rack cable management as described in the
technical manual for the corresponding rack.
Preparing the Server
Figure 25: Preparing the server
Place the outer telescopic rails on the sides of the server (see arrow 1 in figure 25). Slide
the outer telescopic rails forwards to secure them (see arrow 2 in figure 25).
2
1