Installing the ETERNUS CS800 Components Installing the CS800 System in the Rac
U41842-J-Z125-1-76 53
Dokuschablonen qua19x24 Version 1.1us für FrameMaker V7.x vom 25.03.2010 © cognitas GmbH 2001-2010
1. April 2010 Stand 11:05.09 Pfad: G:\allgemein\CS800\1000500_FTS-Doku\1000502_GettingStartedGuide\GettingStarted.k06
3. Secure the left slide rail to the front pillar using the M5 centering screw and M5 pan head
screws.
Figure 29: Securing the left slide rail to the front pillar
4. For the right slide rail, insert the pins in the holes of the rear pillar, and secure the other
side of the slide rail to the front pillar in the same way as the left slide rail.
Figure 30: Attaching the rigth slide rail
5. Push the M5 cage nuts into the 2nd holes of the front rack pillars above the base line of
the controller enclosure.
The M5 centering screw and M5 pan head screw positions for the slide rails and 2 HU
Bracket are determined relatively to the base line of the controller enclosure.
Tighten the screws referring to the following figure.
Figure 31: Tighting the screws
2 HU