EasyManua.ls Logo

GE FVP110 - Troubleshooting

GE FVP110
292 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FVP 110 Fieldbus Valve Positioner Manual
228
GE Energy
LinkScheduleActivationVariable
Writing the version number of an LAS schedule, which has already been downloaded to
the domain, to this parameter causes the corresponding schedule to be executed. On the
other hand, writing 0 to this parameter stops execution of the active schedule.
Table 80 LinkScheduleListCharacteristicsRecord
DlmeScheduleDescriptor
This parameter exists for the same number as the total number of domains, and each
describes the LAS schedule downloaded to the corresponding domain. For the domain to
which a schedule has not yet been downloaded, the values in this parameter are all
zeros.
Table 81 DlmeScheduleDescriptor
Domain
Read/write: impossible; get-OD: possible Carrying out the GenericDomainDownload
command from a host writes an LAS schedule to Domain.

Table of Contents

Related product manuals