EasyManua.ls Logo

GE FVP110 - Installation Diagram (Nonincendive, Division 2 Installation)

GE FVP110
292 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FVP 110 Fieldbus Valve Positioner Manual
16
GE Energy
\
Figure 4 Installation Diagram (Nonincendive, Division 2 Installation)
*1: Dust-tight conduit seal must be used when installed in Class II and Class III
environments.
*2: Installation should be in accordance with the National Electrical Code (ANSI/NFPA 70)
Sections 504 and 505.
*3: The configuration of Associated Nonincendive Field Wiring Apparatus must be FM
Approved.
*4: Associated Nonincendive Field Wiring Apparatus manufacturer’s installation drawing
must be followed when installing this equipment.
*5: No revision to drawing without prior FM Approvals.
*6: Terminator and supply unit must be FM Approved.
*7: If use ordinary wirings, the general purpose equipment must have nonincendive field
wiring terminal approved by FM Approvals.
*8: The nonincendive field wiring circuit concept allows interconnection of nonincendive
field wiring apparatus with associated nonincendive field wiring apparatus, using any of
the wiring methods permitted for unclassified locations.
*9: Installation requirements;
Vmax Voc or Vt

Table of Contents

Related product manuals