EasyManua.ls Logo

GE FVP110 - Travel Calibration; Check Valve Actions

GE FVP110
292 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
47
87/88 Reciprocating Valve
Installing the FVP110 on the
4. Mount the FVP to the mounting bracket using four 1/4 - 20 UNC socket-head cap
screws. The set of mounting holes to be used is dependent upon the specific valve
stroke.
Figure 30 FVP Mounted on Reciprocating Valve
5. Screw the take-off rod to the actuator stem connector.
6. Ensure that the travel pointer is correctly positioned.
7. Bolt the left hand threaded rod end to the take-off rod with 1/4- 20 UNC nut.
8. Connect turnbuckle and lock nuts to each rod end. Turnbuckle length is a function of
actuator size. Verify proper length according to Table 3.
9. Position valve at mid-stroke by supplying air to the actuator or using a manual
handwheel if applicable.
Table 2 Lever Hole Locations for 87/88 Multi-Spring Actuator
Valve Stroke mm
(inches)
Lever Hole
20.3 (0.8) A
25.4 (1.0) A
38.1 (1.5) B
50.8 (2.0) C
63.5 (2.5) C

Table of Contents

Related product manuals