EasyManuals Logo

GE LOGIQ 400 Service Manual

GE LOGIQ 400
526 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #209 background imageLoading...
Page #209 background image
GE MEDICAL SYSTEMS LOGIQ 400 SERVICE MANUAL
2127661
RENEWAL PARTS
6–79
REV 9
6–2–6 CRT Filter (FRU No. 109), CRT Filter Clamp Set (FRU No. 110)
Time Required
1 Minutes
Tool Required
Not necessary
Procedure
Refer to ILLUSTRATION 6–22.
1. Turn OFF the system.
2. Slide the left side filter clamp leftwards and pull it out.
3. Slide the right side filter clamp rightwards and pull it out.
4. Remove the CRT Filter.
CRT FILTER REMOVAL
ILLUSTRATION 6–22
Note
The CRT Filter (FRU109) includes the CRT Filter Clamps (FRU110).

Table of Contents

Other manuals for GE LOGIQ 400

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ 400 and is the answer not in the manual?

GE LOGIQ 400 Specifications

General IconGeneral
BrandGE
ModelLOGIQ 400
CategoryMedical Equipment
LanguageEnglish

Related product manuals