EasyManua.ls Logo

GE LOGIQ 400 - Installing Swivel Lock

GE LOGIQ 400
526 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE MEDICAL SYSTEMS
2127661
LOGIQ 400 SERVICE MANUAL
TM
8–82 OPTIONS
REV 5
8–8–6 Installing Swivel Lock
1. Turn the system power OFF. Follow the OSHA Lockout/Tagout Requirements (29 CFR 1910.147, Direction
46–015902).
2. Unscrew inside two hexagonal bolts fixing the left-side front caster to the frame as shown in
ILLUSTRATION 8–90.
HEXAGONAL BOLTS REMOVAL
ILLUSTRATION 8–90

Table of Contents

Other manuals for GE LOGIQ 400

Related product manuals