EasyManua.ls Logo

GE LOGIQ 400 - Measurement; User Data Backup

GE LOGIQ 400
526 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE MEDICAL SYSTEMS
2127661
LOGIQ 400 SERVICE MANUAL
7–6 PERIODIC MAINTENANCE
REV 2
7–2–3 Measurement
a. Make sure that electrical outlet of hospital should provide the power line standard.
Refer to Chapter 2, Installation.
b. Ensure all power supply voltages are within tolerance.
Refer to section 4–4, Power Supply Adjustment in Chapter 4, Functional Checks, for adjustment proce-
dure.
7–2–4 User Data Backup
a. Keep user preset data into a MO (Magneto Optical) disk using the User Data Backup of LOGIQ 400 Utility
Menu. Refer to 4–3–3, Utility Menu in Chapter 4, FUNCTIONAL CHECKS.
Note
Use new initialized MO disk. It is impossible to save any user data files into the disk which another file
is already stored.
7–2–5 Note
Visual inspection of probes (“head”, cable and connector)

Table of Contents

Other manuals for GE LOGIQ 400

Related product manuals