EasyManua.ls Logo

GE LOGIQ 400 - Page 38

GE LOGIQ 400
526 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LOGIQ 400 SERVICE MANUALGE MEDICAL SYSTEMS
2127661
INSTALLATION
2–6
REV 0
2–1–4 Recommended Ultrasound Room Layout (Continued)
Optional Desirable Ultrasound Room Facilities
These facilities are:
1. Lab sink with hot and cold water;
2. Emergency oxygen supply;
3. Dimmer control for overhead lights;
4. Film viewer;
5. Film and linen storage;
6. Medical equipment storage;
7. Hospital grade equipment electrical outlet;
8. Analog telephone line for connection to InSite;
9. Document storage area for operating and service manuals;
10. Nearby waiting room, dressing room, lavatory
11. Trash bin.
Recommended and Alternate Ultrasound Console Floor Plans
ILLUSTRATION 2–1 provides a recommended standard floor plan and a minimal floor plan for ultrasound equipment

Table of Contents

Other manuals for GE LOGIQ 400

Related product manuals