GE MEDICAL SYSTEMS
2127661
LOGIQ 400 SERVICE MANUAL
RENEWAL PARTS
6–258
REV 9
6–5–2 Replacement Procedures (continued)
Time Required
Approximately 1 Hour
Tools Required
Standard field Service Tool kit
(A) Replacing PS Unit
1. Turn the system power OFF. Follow the OSHA Lockout/Tagout Requirements (29 CFR 1910.147, Direction
46–015902).
2. Remove the Side Cover Left. Refer to 6–2–31 on page 6–127.
3. Remove the Side Cover Right. Refer to 6–2–32 on page 6–128.
4. Remove the Rear Cover. Refer to 6–2–33 on page 6–129.
5. Unscrew two screws (
1
and
2
) to remove the Connector Guard Metal. Refer to ILLUSTRATION 6–142.
CONNECTOR GUARD METAL DISASSEMBLY
ILLUSTRATION 6–142