EasyManua.ls Logo

GE LOGIQ 400 - Page 428

GE LOGIQ 400
526 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE MEDICAL SYSTEMS
2127661
LOGIQ 400 SERVICE MANUAL
7–10 PERIODIC MAINTENANCE
REV 5
7–3–3 Chassis Leakage Current Test (Continued)
Meter Procedure
Follow these steps to test the unit for leakage current.
1. Turn the LOGIQ 400 unit OFF.
2. Plug the unit into the meter, and the meter into the tested AC wall outlet (Refer to ILLUSTRATION 7–6).
GROUND AND CHASSIS LEAKAGE CURRENT TEST
ILLUSTRATION 7–6
3. Plug the black chassis cable into the meter’s “CHASSIS” connector and attach the black chassis cable clamp to
an exposed metal part of the LOGIQ 400 unit (Refer to ILLUSTRATION 7–6).
4. Set the tester’s “FUNCTION” switch to CHASSIS position.
5. Follow the test conditions described in the following table for every test point on the unit.
TABLE 7–1
CHASSIS LEAKAGE CURRENT TEST CONDITIONS
TEST CONDITION
1 Mounting screw for transducer receptacle
2 Wheel support
3 Mounting screw for CRT housing
4 Mounting screw for peripheral plugged into unit
5 Mounting screw for other peripheral powered by unit
6. Keep a record of the results with other hard copies of PM data kept on site.

Table of Contents

Other manuals for GE LOGIQ 400

Related product manuals