Chapter 8 - Replacement Procedures 8-17
D
IRECTION 5771498-100, REVISION 6 VENUE™ SERVICE MANUAL
PRELIMINARY
8-3-8-5 MPB Door Cover Installation Procedure
1.) Install the MPB Cover on the scanner.
2.) Refit the following covers: Lower Front eTower cover, Right Side eTower Cover and the Left Side
eTower Cover.
3.) Install all accessories.
• Right Side eTower Cover Installation Procedure
• Left Side eTower Cover Installation Procedure
• Lower Front eTower Cover Installation Procedure
• RS Probe Cover Installation Procedure
• Accessories - Replacement Procedures
Perform the checks listed in MPB Door Cover Replacement Procedure on page 8-216