Page 47
TRANSFER SWITCH
PART 3
3. Set a VOM to measure AC voltage.
4. Connect one meter test lead to Wire N1 at the incoming
Utility sensing connector. Connect the other meter test
lead to Wire N2. Approximately 240 VAC should be
measured.
Results
1. If voltage was measured in Step 4 and the pin
connections are good, replace the circuit board.
2. If voltage was NOT measured in Step 4, repair or replace
Wire N1/N2 between connector and terminal block.
Section 3.4
Diagnostic Tests

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Generac Power Systems CorePower and is the answer not in the manual?

Generac Power Systems CorePower Specifications

General IconGeneral
BrandGenerac Power Systems
ModelCorePower
CategoryPortable Generator
LanguageEnglish

Related product manuals