EasyManua.ls Logo

Geoscan 201 - Page 21

Geoscan 201
95 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7. Put rigging lines in the pocket. Measure the length of the bundle of rigging lines
exceeding the depth of the pocket. Fold the rigging lines bundle in half and stretch
in the pocket, so that the bend of the bundle a few centimeters protruded from the
opposite side of the pocket. If necessary, you can eliminate the slack of the rigging
lines at the edge of the Dome by pulling them over the bend on the opposite side of
the bundle.
Putting the rigging lines into the pocket
8. Move holding ring to dome. Put straps in empty dome pocket.
Rigging lines pulling through the pocket
The rigging lines remaining part is positioned between the loops of the rigging lines
after laying.
21

Related product manuals