GM Energy V2H Bundle Installation Manual 77
Photos for V2H Bundle
Photo Taken
During Install
Main service panel (cover removed, all wiring
terminations visible)
Main service panel (cover on, all labeling
legible)
Load center 1 (if applicable, cover removed, all
wiring terminations visible)
If applicable (same reason as MSP).
Load center 1 (if applicable, cover on, all
labeling legible)
If applicable (same reason as MSP).
Additional load center (if applicable, cover
removed, all wiring terminations visible)
If applicable (same reason as MSP).
AC disconnect (if required, cover removed,
fuses legible)
Required if MSP and Hub are not in same space
and accessible.
AC Disconnect labeling (if applicable, cover on,
labeling legible)
Verify which equipment AC disconnect is
associated with. (NEC 625.43 Disconnecting
Means)
Solar System (if present; include any subarrays)
Consumption CTs (any additional premises CT’s
must be captured)
Verify orientation and wiring.
Hub mounting bracket (attached to wall, with
sample fastener atop)
Inverter mounting set screws
Hub (top half, cover removed, top back-up
section with all wiring, terminations, and
breakers visible)
Capture additional CT congurations if
applicable.
Verify Eaton Breaker and backup breaker
torque/phasing.
Verify ground bonding strap (if installed), and
grounding terminations and torque.
Verify PCB wiring connections.
Verify non-factory wiring workmanship (eld
wiring).
Verify consumption CTs orientation.
Verify conduit entry and wiring workmanship.