68 Preventive Maintenance and Installation
P/N: SM-ACP215-01-EN(AB) Haemonetics
®
ACP-215
®
Service Manual
Equipment Integrity Inspection
Electrical
Connections
Inspection
1. Remove the front and the back panels to gain access to the internal
components.
2. Inspect for loose or broken electrical connections on all major
assemblies. Tighten or repair as required.
Pneumatic
Connections
Inspection
Inspect the pneumatic valve connections, the manifold assembly connections
on the top deck distribution board, and the valve compressor assembly
connections.
Hardware
Inspection
1. Inspect for loose or missing mounting hardware. Tighten and repair as
required.
2. Inspect the centrifuge drain tubes for proper placement. Ensure that
there is unobstructed passage for fluids from the centrifuge.
3. Inspect the centrifuge mounting location to ensure that the centrifuge
does not contact the deck. There should be a clearance of at least 1/8”
between the centrifuge and the deck cavity all the way around the
centrifuge and a visible gap between the base of the centrifuge rim and
the deck surface.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Haemonetics ACP 215 and is the answer not in the manual?

Haemonetics ACP 215 Specifications

General IconGeneral
BrandHaemonetics
ModelACP 215
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals