EasyManua.ls Logo

Hioki BT3564 - Chapter 3 Measurement; 3.1 Pre-Operation Inspection

Hioki BT3564
210 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2.1 Preparation Flowchart
15
2
Chapter 2 Measurement Preparations
This procedure describes instrument preparations such as making connections and turning power on.
Measurement
Preparations Chapter 2
2.1 Preparation Flowchart
Rear Panel
2
1
4
( p.17)( p.16)
( p.18)
3
5
Front Panel
1
Connecting the power cord
( p.16)
2
Connecting the test leads to the instru-
ment
( p.17)
3
Connecting the EXT I/O connector and
interface connector
( p.98)
4
Turning the power on
( p.18)
5
Seting the measurement settings
( p.21)
6
Starting a measurement
Verify that the instrument’s line frequency is correctly set when using it for the
first time and after initialization following repair or recalibration.
See "2.5 Selecting the Line Frequency" ( p.20).
HIOKI BT3564A961-02

Table of Contents

Related product manuals