2.1 Preparation Flowchart
15
2
Chapter 2 Measurement Preparations
This procedure describes instrument preparations such as making connections and turning power on.
Measurement
Preparations Chapter 2
2.1 Preparation Flowchart
Rear Panel
2
1
4
( p.17)( p.16)
( p.18)
3
5
Front Panel
1
Connecting the power cord
( p.16)
2
Connecting the test leads to the instru-
ment
( p.17)
3
Connecting the EXT I/O connector and
interface connector
( p.98)
4
Turning the power on
( p.18)
5
Seting the measurement settings
( p.21)
6
Starting a measurement
Verify that the instrument’s line frequency is correctly set when using it for the
first time and after initialization following repair or recalibration.
See "2.5 Selecting the Line Frequency" ( p.20).