FALCON USER GUIDE
EN2Z-0962GE51 R0715 170
Calendars
Please refer also to the "Time Programs" section, p. 113.
Calendars are assigned to a whole project. They contain exception days or periods,
e.g. Christmas, holidays. If controller schedules refer to the same calendar(s),
project wide scheduling is possible for these controllers; this is because calendar
dates are executed in each controller of the project, which has references to the
calendar. Changes in multiple particular controller schedules can be quickly made
by simply changing the referenced calendar(s).
View Calendars
Procedure 1. In the tree, expand the Advanced item and click on Calendars.
RESULT: On the right, the Calendars tab displays showing all existing
calendars.
All changes done to a calendar on this controller level will be synchronized with
all other controllers of the same project.
For each calendar the following properties are shown:
Calendar Name
Description

Table of Contents