Figure 3-65 Disassemble the Camera
Step 3 Attach the drill template (supplied) to the place where you want to fix the camera.
Step 4 Drill three screw holes in the ceiling according to the drill template.
Figure 3-66 Drill Template
Step 5 If you want to route the cables inside the ceiling, drill a cable hole in the ceiling according to
the drill template. Skip this step if you want to route the cables on the surface of the ceiling.
Step 6 Attach the camera to the ceiling by aligning the holes of the back box with the holes on the
ceiling.
IPC6131-WD-A&6123-WDL-A&6232-IR&6212-
IR&6231-WD-VRZ&6332-MIR&6311-IR&6331-IR
User Guide
3 Camera Installation
Issue 02 (2014-12-25) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
44