EasyManua.ls Logo

Huawei NetCol5000-A - Page 193

Huawei NetCol5000-A
269 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NetCol5000-A 42 kW Air Cooled In-row Precision Air
Conditioner
User Manual
5 Operation and Maintenance
Issue 01 (2017-07-27)
185
Step 5 Install the new condensate pump and reinstall the condensate pump assembly in the cabinet.
Connect the water pipe and secure it using hose clamps. Connect the condensate pump power
cable.
Figure 5-34 Installing a condensate pump
Step 6 Remove the blockage from the pipe and close the front door.
Step 7 Power on the device. On the LCD home screen, choose Maint > Performance Maint, and
clear the condensate pump runtime.
Figure 5-35 Performance maintenance
Step 8 Tap Startup on the home screen. Ensure that the air conditioner is running normally without
any alarms.
----End

Table of Contents

Related product manuals