NetCol5000-A(025, 035) In-row Air Cooled Smart
Cooling Product
User Manual (600 mm Width)
Issue 17
Date 2020-10-22
HUAWEI TECHNOLOGIES CO., LTD.

Table of Contents

Other manuals for Huawei NetCol5000-A035

Question and Answer IconNeed help?

Do you have a question about the Huawei NetCol5000-A035 and is the answer not in the manual?

Huawei NetCol5000-A035 Specifications

General IconGeneral
ModelNetCol5000-A035
Cooling Capacity35 kW
RefrigerantR410A
Noise Level≤65 dB(A)
Power Supply380/400/415 V AC, 50/60 Hz
Dimensions (HxWxD)2000 mm x 600 mm x 1000 mm

Summary

1 Safety Information

1.1 General Safety

General safety guidelines for operating and maintaining the equipment.

1.2 Personnel Requirements

Specifies the qualifications and training required for personnel.

1.3 Electrical Safety

Ensures proper grounding and electrical safety precautions.

1.4 Installation Environment Requirements

Requirements for the environment where the equipment is installed.

1.5 Mechanical Safety

Safety guidelines for mechanical operations like hoisting and ladders.

1.6 Cooling System Safety

Safety precautions related to the cooling system, welding, and pressure.

2 Product Description

2.1 Model Description

Explains the naming rule for the NetCol5000-A series products.

2.2 Composition

Describes the components of the NetCol5000-A system.

2.2.1 Indoor Unit

Details the appearance and components of the indoor unit.

2.3 Working Conditions

Specifies operating temperature and humidity requirements.

2.4 Technical Specifications

Provides general parameters and specifications of the product.

3 Installation Guide

3.1 Installation Preparation

Preparation steps and tools needed for installation.

3.1.1 Tools

Lists the general tools required for installation.

3.1.2 Material Preparations

Lists materials required for installation and optional components.

3.1.2.1 Refrigerant R410A

Details about the R410A refrigerant and its quality checks.

3.1.2.3 Pipe Components

Lists and describes optional pipe components for installation.

3.1.2.4 Humidifier Water Inlet Pipe, Pump Drainpipe, and Automatic Drainpipe

Instructions for installing water and drain pipes for humidifiers.

3.1.3 Deployment Principles

Principles for positioning and layout during installation.

3.2 Unpacking

Procedure for unpacking the product.

3.3 Checking the Air Pressure

Procedure for checking the air pressure in the system.

3.4 Removing Transport Fixing Sheet Metals

Procedure for removing transport fasteners from components.

3.4.1 Removing Transport Fasteners from Floats

Procedure for removing transport fasteners from floats.

3.4.2 Removing Transport Fasteners from Compressor

Procedure for removing transport fasteners from the compressor.

3.5 Install Process

Flowchart illustrating the indoor unit installation process.

3.6 Installing Indoor Units

Steps for installing the indoor unit.

3.6.1 Installing Indoor Unit in Securing Mode

Procedure for installing the indoor unit on a base or raised floor.

3.6.2 Installing Indoor Unit in Non-securing Mode

Procedure for installing the indoor unit directly on the floor.

3.8 Exhausting Nitrogen

Procedure for exhausting nitrogen from refrigerant pipes before welding.

3.9 Connecting Pipelines

Guidelines for connecting refrigerant pipes.

3.9.1 Connecting Refrigerant Pipes

Procedure and considerations for connecting refrigerant pipes.

3.9.2 Connecting Water Pipes

Instructions for connecting water pipes for humidifier and drain.

3.9.3 Leak Checking

Procedure for checking refrigerant pipes for leaks.

3.10 Installing Cabinet Accessories

Instructions for installing optional cabinet accessories like enclosure frames.

3.10.1 Installing an Enclosure Frame

Procedure for installing an enclosure frame to expand depth.

3.10.2 Installing the Top Frame

Procedure for installing a top frame to increase height.

3.11 Connecting Cables

Guidelines for connecting power, signal, and communication cables.

3.11.1 Preparations and Precautions

Preparations and safety precautions before connecting cables.

3.11.2 Connecting the Power Cable

Procedure for connecting the power cable to the indoor unit.

3.11.4 Connecting the Signal Cables

Details on connecting various signal cables.

3.11.4.2 Connecting Water Sensor

Procedure for connecting the water sensor cable.

3.11.5 Teamwork Networking and Monitoring

Configuration for teamwork networking and monitoring.

3.12 Connections Verification

Checklist for verifying all connections after installation.

4 ACC Introduction

4.1 Appearance

Description of the controller's appearance and indicator status.

4.2 Controller Ports

Diagram showing the ports on the controller.

4.3 Home Screen

Overview of the controller's home screen interface.

4.4 Menu Hierarchy

Visual representation of the controller's menu structure.

4.5 Power-On Commissioning

Steps for initial setup and configuration after power-on.

4.5.1 Quick Settings

Procedure for performing initial quick settings.

4.5.2 Initial Configuration

Steps for initial configuration of the system.

4.5.2.1 User Right Authentication

Procedure for user login and authentication for security.

4.5.2.3 Setting Temperature and Humidity Values

Procedure for setting temperature and humidity parameters.

4.5.2.4 Setting Communications Parameters (IP Address Settings)

Procedure for setting IP address, subnet mask, and gateway.

4.5.2.5 Setting Communications Parameters (ModBus Settings)

Procedure for configuring Modbus communication parameters.

4.5.2.6 Setting Teamwork Control Parameters

Parameters for configuring teamwork control among multiple units.

4.5.2.7 Setting Alarm Parameters

Optional settings for configuring alarm reporting and behavior.

4.5.3 Commissioning Guide

Steps for commissioning smart cooling product components.

4.6 Maintenance Guide

General guidance for maintaining the smart cooling product.

4.6.1.1 Querying Temperature and Humidity Curves

Procedure to view temperature and humidity curves.

4.6.1.2 Querying Alarms

Procedure to query active and historical alarms.

4.6.1.3 Querying Logs

Procedure to query system logs.

4.6.1.4 Querying Device Runtime

Procedure to query device runtime data.

4.6.1.5 Querying Component Status

How to check the status of system components.

4.6.1.6 Querying System Parameters

How to query system parameters via Operating Info or Device Details.

4.6.2 Changing Parameters

Procedures for changing system parameters.

4.6.2.1 Deleting Historical Alarms

Procedure to delete historical alarm records.

4.6.2.3 Exporting Data

Procedure for exporting system data like alarms and logs via USB.

4.6.2.5 Calibrating a Sensor

Procedure for calibrating temperature and humidity sensors.

4.7 FAQ

Frequently Asked Questions and troubleshooting.

4.7.1 How to Perform Quick Settings

Answers questions about performing quick settings.

4.7.3 How to Change a Password

Answers questions about changing user passwords.

4.7.4 Restoring Factory Settings

Answers questions about restoring factory settings.

4.7.5 Troubleshooting Faults in Upgrade Mode

Troubleshooting for system faults during upgrade mode.

4.7.7 Manually Clear Alarms

Procedure for manually clearing alarms.

4.7.11 Change SSH Access Password

Procedure for changing the SSH access password.

4.7.12 Rectifying E-label Identification Board Faults

Troubleshooting steps for E-label identification board faults.

4.7.13 Importing a Certificate and Key

Procedure for importing security certificates and keys.

5 Power-On Commissioning

5.1 Commissioning Tools

Lists the tools required for commissioning the equipment.

5.2 Vacuumizing and Charging Refrigerant

Procedures for vacuumizing and charging refrigerant and oil.

5.2.1 Refrigerant and Oil Calculation

Calculations for determining refrigerant and oil charge amounts.

5.2.3 Vacuumizing

Procedure for vacuumizing the cooling system.

5.2.4 Partially Charging Refrigerant

Procedure for partially charging the refrigerant.

5.3 Commissioning Preparations

Checks and preparations before powering on for commissioning.

5.3.1 Checking Before Power-on

List of checks to perform before powering on the unit.

5.3.3 Power-On

Procedure for powering on the unit.

5.5 Commissioning Procedure

Detailed steps for commissioning the system.

6 System Operation and Maintenance

6.1 Maintenance Components

Identifies components that require maintenance.

6.2 Routine Maintenance

Procedures for regular maintenance tasks.

6.2.2 Maintenance Tools

Lists the tools required for performing maintenance.

6.2.4 Monthly Maintenance

Specific maintenance items to be performed monthly.

6.2.5 Quarterly Maintenance

Specific maintenance items to be performed quarterly.

6.3 Alarm Reference

Reference for system alarms, their causes, and solutions.

6.4 Troubleshooting

General troubleshooting guide for common issues.

6.5 Parts Replacement

Procedures for replacing various system parts.

6.5.1 Replacing Filters

Procedure for replacing the air filters.

6.5.2 Replacing a Indoor Fan

Procedure for replacing the indoor fan.

6.5.3 Replacing a Compressor

Procedure for replacing the compressor unit.

6.5.4 Replacing the High Pressure Switch

Procedure for replacing the high pressure switch.

6.5.5 Replacing Compressor Drive

Procedures for replacing Huawei and Danfoss compressor drives.

6.5.5.1 Replacing a Huawei Compressor Drive

Procedure for replacing the Huawei compressor drive.

6.5.6 Replacing Condensate Pump

Procedure for replacing the condensate pump.

6.5.7 Replacing Humidifier Cylinder

Procedure for replacing the humidifier cylinder.

6.5.8 Replacing Electric Heater

Procedure for replacing the electric heater.

A Electrical Ports of an Indoor Unit

B General Layout

C Acronyms and Abbreviations

D Electric Diagram

E Main Control Board Diagram

F Humidifier Control Diagram

G Controller Menu Structure

Related product manuals