5.6 Checking After Commissioning
Table 5-4 lists the commissioning checklist.
Table 5-4 Commissioning checklist
Check Item Actual Result
The controller exits the diagnostic mode. □Passed. □Failed.
The temperature and humidity are properly set. □Passed. □Failed.
All circuit breakers are on. □Passed. □Failed.
The drainage button on the electrical control box is in the
position of normal humidifying.
□Passed. □Failed.
No oil stain exists on the copper pipe thermal insulation
foam or bottom plate, or it has been cleaned.
□Passed. □Failed.
5.7 Power O
Procedure
Step 1 On the home page, tap Shutdown.
Exercise caution during operation because the unit is still live.
Step 2 Switch o the main circuit breaker QF1.
Step 3 If the smart cooling product needs to be maintained in
power-o mode or long-
term power-o, switch o the smart cooling product external circuit breaker.
----End
NetCol5000-A(025, 035) In-row Air Cooled Smart
Cooling Product
User Manual (600 mm Width) 5 Power-On Commissioning