EasyManua.ls Logo

Huawei NetCol5000-A - Page 55

Huawei NetCol5000-A
269 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NetCol5000-A 42 kW Air Cooled In-row Precision Air
Conditioner
User Manual
3 Installation Guide
Issue 01 (2017-07-27)
47
Figure 3-21 Distances between mounting holes (unit: mm)
Step 2 Drill a hole in each mounting hole position using a hammer drill.
Step 3 Move the cabinet over its castors to the installation position.
Step 4 Level and combine the cabinets by referring to Figure 3-18 and Figure 3-19.
Step 5 Secure the air conditioner cabinet to the ground using the M12 bolts in the fittings bag.

Table of Contents

Related product manuals