EasyManuals Logo
Home>IBM>Power Supply>9009-42G

IBM 9009-42G User Manual

IBM 9009-42G
730 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #100 background imageLoading...
Page #100 background image
must be removed with the system operating, ensure that all such loose material is secured
away from the fan area, to prevent any loose material from being pulled into the fan.
Figure 79. Removing the front cover
4. Determine whether the repair operation can continue when the system power is turned on.
To continue the repair operation when the system power is turned on, the following conditions must
be true:
• Fans must be installed in all ve slots.
Each of the îš³ve fans has a green LED and an amber LED, as shown in Figure 80 on page 95. The
green LED is lit solid for all îš³ve fans, but the fan with the failure has the flashing amber fault LED.
• If only one amber fault LED is On, the repair operation can be completed when the system power is
turned on.
94
Power Systems: Removing and replacing parts in the 9080-M9S system

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM 9009-42G and is the answer not in the manual?

IBM 9009-42G Specifications

General IconGeneral
BrandIBM
Model9009-42G
CategoryPower Supply
LanguageEnglish

Related product manuals