Preparing the 9080-M9S system for operation after removing and replacing
the control panel
To prepare the system for operation after removing and replacing a control panel, complete the steps in
this procedure.
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. Position the cover (A) on the front of the system control unit as shown in the following îš³gure and press
the cover into position.
Note: Use care to not touch the power button when replacing the cover.
Figure 73. Installing the front cover
3. If you unplugged a USB cable from the control panel, using your label, replace the USB cable in the
control panel.
4. Check that the power indicator is on.
5. If you powered off the system to complete this repair, wait for the service processor comes up to the
Flexible Service Processor (FSP) standby state (the power-on LED on the control panel is flashing
84
Power Systems: Removing and replacing parts in the 9080-M9S system