EasyManuals Logo
Home>IBM>Power Supply>9009-42G

IBM 9009-42G User Manual

IBM 9009-42G
730 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #726 background imageLoading...
Page #726 background image
d) After the latch is fully closed, push in the lever (B) on the right side of the latch to secure the card in
its slot.
Figure 631. Replacing the VPD card
Preparing the system for operation after removing and replacing the VPD
card in the 9080-M9S system control unit
Follow these steps to prepare the system control unit for operation after removing and replacing the vital
product data card.
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. If you powered off the system to complete this repair, wait for the service processor comes up to the
Flexible Service Processor (FSP) standby state (the power-on LED on the control panel is flashing
slowly) then continue to the next step to validate all of the cables. If you did not power off the system,
skip the next step and continue to the step to validate only the UPIC cables.
3. Access the ASMI and run the Cable Plugging Validation utility to validate all of the cables.
720
Power Systems: Removing and replacing parts in the 9080-M9S system

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM 9009-42G and is the answer not in the manual?

IBM 9009-42G Specifications

General IconGeneral
BrandIBM
Model9009-42G
CategoryPower Supply
LanguageEnglish

Related product manuals