Figure 93. Removing the UPIC cable from the system node
e) If needed to allow for more slack in the SMP cables, label and unclip the SMP cable bundle from the
side of the cable management bracket as shown in the following gure, and move the SMP cables
to near the center of the system node.
110
Power Systems: Removing and replacing parts in the 9080-M9S system