Figure 272. Replacing the SMP cable into the system node
b) Repeat step “4.a” on page 320 until all the SMP cables previously identied are reconnected to
the system node you are servicing.
c) If you removed any SMP cable clips from the side of the rack, using your labels, reattach the cable
bundle to the side of the cable management bracket as shown in the following gure.
Miscellaneous VRMs
321