EasyManua.ls Logo

IBM DS4800 - Interconnect-Battery Unit Needs Attention and Service Action Allowed Leds

IBM DS4800
250 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5. Put on antistatic protection.
6. Unpack the interconnect-battery unit.
Save all packing materials in the event you need to return the new
interconnect-battery unit.
7. Unlatch both the top and bottom levers of the interconnect-battery unit and
rotate both levers straight out simultaneously to remove the failed
interconnect-battery unit. (Figure 96 on page 159 shows the
interconnect-battery unit sliding from the storage subsystem chassis.)
Service Action
Allowed LED (blue)
ds48049
Overall DS4800 Configuration
Needs Attention LED (amber)
Figure 95. Interconnect-battery unit Needs Attention and Service Action Allowed LEDs
158 IBM System Storage DS4800 Storage Subsystem: Installation, User’s, and Maintenance Guide

Table of Contents

Other manuals for IBM DS4800

Related product manuals