Replacing the bezel
This procedure applies only to 4U server models with non-hot-swap power
supplies.
To install the bezel on 4U server models with non-hot-swap power supplies,
complete the following steps.
1. Read the safety information in “Safety” on page vii and “Installation
guidelines” on page 35.
2. Insert the three tabs on the bezel into the corresponding holes in the front of
the server.
3. Rotate the bezel to the server until it locks securely into place.
4. Reconnect the external cables and power cords; then, turn on the attached
devices and turn on the server.
Figure 87. Bezel installation for 4U server model with non-hot-swap power supplies
188 System x3100 M5 Type 5457: Installation and Service Guide