QFX5240 Site Preparaon Checklist
The checklist summarizes the tasks you need to perform when preparing a site for installing a QFX5240
switch.
Table 12: Site Preparaon Checklist
Item or Task For More
Informaon
Performed by Date
Environment
Verify that environmental factors such as temperature
and humidity do not exceed switch tolerances.
Power
Measure the distance between external power sources
and the switch installaon site.
Calculate the power consumpon and requirements.
Rack or Cabinet
Verify that your rack or cabinet meets the minimum
requirements for the installaon of the switch.
Plan rack or cabinet locaon, including required space
clearances.
Secure the rack or cabinet to the oor and building
structure.
Cables
38