- 16 -
INSTALLATION
TD TANK
1. MAINTENANCE SPACE
When installing the TD tank, pay full attention to the safety (strength, water-tightness, etc.).
At the same time, secure a space for maintenance and inspections.
- Since the Hull unit is not a waterproof structure, keep it away from water drops and
splashes.
When mounting the TD shaft to the Transducer unit, be sure not to damage the TD shaft
thread or twist the Transducer unit cable
TD TANK LENGTH (Lt) +181mm
Flange should be positioned
over the draft at full load.
Do not protrude TD tank from beneath the keel.
Lt
TD tank length
(min:670)
If the working space (LT+535)
is not available, provide a hole
of a size of at least 300x300mm
in the ceiling.
In case the Junction Box is
mounted on the Hull unit, it
might be required to be
separated from the Hull unit or
provide a hole of a size of at
least 300x300mm in the ceiling
if there is no sufficient work
space.
The drawing shows the optional
mounting method, the Junction
Box is mounted on the Hull unit.