EasyManua.ls Logo

LevelOne GNS-4001 - 2.2 Tower installation

LevelOne GNS-4001
102 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
2.2 Tower installation
1. Pull out a HDD tray from the GNS-4001 mobile rack.
2. Secure and mount a hard disk onto the HDD tray using four screws under the tray.
3. Insert the HDD tray back in the mobile rack. Make sure the lever of the mobile rack is properly in
place.
4. Repeat Step 1 to Step 3 if necessary for the other HDD trays.
5. Connect your NAS server to the network by attach a LAN cable from the LAN port located at the
back of your NAS server.(At least one network connection is required)
6. Plug the power cord into the power connector on you NAS server.
7. Make sure the power switch on the power supply is in ON position.
8. Press the power button on the upper right hand corner of your NAS server.
9. Wait for the server to boot up. The boot up process takes approximately 2 minutes.

Table of Contents

Other manuals for LevelOne GNS-4001

Related product manuals