Do you want to continue (yes/no): yes
13. Wait for the ok prompt to appear.
14. Power down the AW units and MCC terminal in the following order:
For a Netra
3
t 1120 or Netra 20 workstation:
1. Netra t 1120 and Netra 20 workstation. See "Remove Power to
Administrative Workstation (Netra t 1120 and Netra 20)", Procedure 4.7.
2. MCC terminal
For a Netra 240 workstation:
1. Netra 240 workstation and external tape device. See "Remove Power to
Administrative Workstation Units (Netra 240)", Procedure 4.9.
2. MCC terminal
15. Connect the dial-up MCC hardware as shown in Figure 8.5-1. Refer to Table
8.5-1 for cable designations.
3. Trademark of Sun Microsystems, Inc.
235-200-150
October 2005
GROWTH AND DEGROWTH
Procedure 8.5
Issue 3.00B Page 8.5-3