EasyManua.ls Logo

MacDon M1 Series - Page 86

MacDon M1 Series
266 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
215620 74 Revision A
Positioning the air conditioning drain hoses

$
%
&
'
(
(
)
Figure 3.65: A/C Drain Hoses
35. Route drain hoses (A) from air conditioning (A/C) unit
through hole (B) in the frame and into the space between
the front platform support and DEF tank.
36. Make a loop in drain hoses with cable ties. Loop height (C)
should be 190 mm (7 1/2 in.) maximum; the remaining
hose length (D) should hang 120 mm (4 3/4 in.) below
bottom of the platform support.
37. Fasten the loop to slot (E) in the platform support with
cable tie.
38. Pull the hose ends through hole (F) in the bottom of the
platform support.
ASSEMBLING WINDROWER

Table of Contents

Other manuals for MacDon M1 Series

Related product manuals