HEADER OPERATION – A SERIES
Form 169469/169470/169471 108 Revision C
h. Activate HEADER TILT switch on GSL to
release load on center link cylinder (G).
i. Lift hook release (H).
j. Operate the link lift cylinder with REEL UP
switch on GSL to disengage the center link from
the header.
k. Disconnect header drive hydraulics (J) and
electrical harness (K). Refer to the Auger
Header Operator’s Manual.
l. Slowly back windrower away from header.
m. Re-install pins (A) in header boots (B).