HEADER OPERATION – R SERIES
Form 169469/169470/169471 115 Revision C
h. Install pin (A) through each boot and foot and
secure with hairpin.
IMPORTANT
Ensure pin (A) is fully inserted and hairpin
is installed behind bracket.
i. Remove pin (F) from storage position in linkage
and insert in hole (G) to engage float springs.
Secure with hairpin.
j. Disengage lift cylinder stops.
k. Start engine, and activate HEADER DOWN
switch on GSL to lower header fully. Stop
engine and remove key.
l. Connect header drive hydraulics and electrical
harness to header. Refer to your Rotary Disc
Header Operator’s Manual.