MI 3152(H) EurotestXC (2,5 kV) Tests and measurements
146
Measurement procedure
Enter the Rpe function.
Set test parameters / limits.
Connect test cable to the instrument.
Connect test leads or Plug commander to the object under test, see Figure 7.79.
Save results (optional).
Figure 7.80: Examples of PE conductor resistance measurement result
Measurement results / sub-results