MI 3152(H) EurotestXC (2,5 kV) Auto Sequences
165
8.2 Organization of an Auto Sequence®
An Auto Sequence® is divided into three phases:
Before starting the first test the Auto Sequence® view menu is shown (unless it was
started directly from the Main Auto Sequences® menu). Parameters and limits of
individual measurements can be set in this menu.
During the execution phase of an Auto Sequence®, pre-programmed single tests are
carried out.
After the test sequence is finished the Auto Sequence® result menu is shown. Details of
individual tests can be viewed and the results can be saved to Memory organizer.
8.2.1 Auto Sequences® view menu
In the Auto Sequence® view menu, the header and the single tests of selected Auto
Sequence® are displayed. The header contains Name, Short code and description of the Auto
Sequence®. Before starting the Auto Sequence®, test parameters / limits of individual
measurements can be changed.
Note
Once fuse and RCD parameters are changed in active Auto Sequence®, the new
settings are distributed through all single tests within active Auto Sequence® and stored
for next use of same Auto Sequence®.
8.2.1.1 Auto Sequence® view menu (Header is selected)
Figure 8.4: Auto Sequence® view menu – Header selected
Options
Starts the Auto Sequence®.