EasyManua.ls Logo

Milli-Q Direct 8 - Page 112

Milli-Q Direct 8
116 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
112 Milli-Q® Direct 8/16 System
Summary of Alert messages, Continued
Alert messages
(continued)
REPLACE Q-PAK PACK
The System has determined that the
Q-Pak® Pack should be replaced.
Replace the Q-Pak® Pack.
REPLACE Q-PAK PACK IN XX DAYS
The System has determined that the
Q-Pak® Pack should be replaced in
XX days, where XX is 15, …, 1.
Replace the Q-Pak® Pack.
REPLACE PROGARD AND TANK
VENT FILTER
The System has determined that the
Progard® Cartridge and the Vent Filter
should be replaced.
Replace the Progard® Cartridge and
the Vent Filter.
REPLACE PROGARD AND TANK
VENT FILTER IN XX DAYS
The System has determined that the
Progard® Cartridge and the Vent Filter
should be replaced in XX days, where
XX is 15, …, 1.
Replace the Progard® Cartridge and
the Vent Filter.
REPLACE UV 185 NM LAMP
The System has determined that the
UV 185 nm Lamp should be replaced.
Contact Millipore SAS.
REPLACE UV 185 NM LAMP IN XX
DAYS
The System has determined that the
UV 185 nm Lamp should be replaced
in XX days, where XX is 15, …, 1.
Contact Millipore SAS.
REPLACE UV 254 NM LAMP
The Water System has determined
that the UV 254 nm Lamp should be
replaced.
Contact Millipore SAS.
REPLACE UV 254 NM LAMP IN XX
DAYS
The Water System has determined
that the UV 254 nm Lamp should be
replaced in XX days, where XX is
15, …, 1.
Contact Millipore SAS.
RO REJECTION < SP
The RO % Rejection is below the set
point.
Contact Millipore SAS.
SERVICE VISIT OVERDUE XX DAYS
The System has determined that a
Service Visit is overdue.
Contact Millipore SAS.
Continued on next page

Related product manuals