EasyManua.ls Logo

Milli-Q Direct 8 - Page 80

Milli-Q Direct 8
116 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
80 Milli-Q® Direct 8/16 System
Replacing the Q-Pak® Pack, Continued
Placing
(continued)
Step
Action
Diagram
3
Push the Pack Locking Handle
down.
Close the left door.
4
When a new Q-Pak® Pack is
installed, the screen looks like
this.
Press .
Rinsing
The Q-Pak® pack, when newly installed, needs to be rinsed. This ensures optimal water
quality.
Step
Action
Diagram
1
Locate the clear tubing and the
barbed fitting from the System
accessories bag.
Screw the barbed fitting onto
the POD Unit.
NOTE:
Do not use any white tape on
the threads of the barbed fitting.
An O-ring is located inside the
POD Unit.
Push one end of the clear tubing
onto the end of the barbed
fitting.
Place the other end of the clear
tubing into a sink.
Continued on next page

Related product manuals