SETUP
Figure 6-1 Test Setup
1
Connect reusable adult patient breathing circuit to the e360
ventilator to be tested. Attach a test lung to the patient
breathing circuit
Y-Piece.
2 Connect the calibration analyzer with oxygen sensor between
the main flow outlet and the patient breathing circuit.
3 Connect regulated adjustable air and oxygen gas supplies to
ventilator inlets on the back of the ventilator
. Set regulators to
50 psig.
4 Make a copy of the e360
T
est Record sheets provided at the
end of this section. Check the appropriate box or record
appropriate data on the record sheet after each test is
performed.
ELECTRICAL SAFETY CHECKS
Ground Resistance Test
1 Connect the
A.C. power cord to the EST
analyzer.
2 Connect the ground lead of the EST analyzer to the labeled
equipotential connection on the back of the ventilator
.
3 Perform ground resistance check and record the results on
the OVP record sheet. To pass, the ventilator ground
resistance must be ? 0.1?.
OPERATIONAL VERIFICATION PROCEDURE
Y-Piece
Breathing Circuit
6-2 SER360 A1106