EasyManua.ls Logo

Newport e360 - Main Board (PCB2100 A); Main Board Support (CVR2103 M)

Newport e360
129 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5 For ESD protection, place the main board in an ESD safe
container.
6 To reinstall, reverse above steps 2 and 3.
Note: If the main board PCB2100A is replaced, the e360 ventilator
will need sofware reloaded and D5, D1, D2, D9 and D4 calibrations
performed.
Note: Refer to Section 2 for Software Upgrade Procedure. Refer to
Section 5 for all the other calibrations.
Removal and Replacement of Main Board Support CVR2103M
Figure 4-5 Main Board Support CVR2103M
Refer to figure 4-5 and follow these steps:
1 Perform steps above for removal of Front Panel
Assembly
DSP2102A.
2 Remove cable CBL2106A
from J4 on PCB2100A.
3 Remove the cables CBL2125A
and CBL2102A
from the top LEDs
.
4 Remove Qty 4 screws and washers securing the main board
support to the front panel assembly
.
5 Carefully lift up on the main board support and feed the
cables CBL2105A, CBL2106A
and CBL21
12A
through the cut
out on the main board support.
COMPONENT REMOVAL & REPLACEMENT
Main board,
PCB2100A
CBL2106 connected
to J4 on PCB2100A
CBL2102A and
CLB2125A
CVR2103M
Remove 4
screws, 2
each side
4-6 SER360 A1106

Table of Contents

Other manuals for Newport e360

Related product manuals