5 For ESD protection, place the main board in an ESD safe
container.
6 To reinstall, reverse above steps 2 and 3.
Note: If the main board PCB2100A is replaced, the e360 ventilator
will need sofware reloaded and D5, D1, D2, D9 and D4 calibrations
performed.
Note: Refer to Section 2 for Software Upgrade Procedure. Refer to
Section 5 for all the other calibrations.
Removal and Replacement of Main Board Support CVR2103M
Figure 4-5 Main Board Support CVR2103M
Refer to figure 4-5 and follow these steps:
1 Perform steps above for removal of Front Panel
Assembly
DSP2102A.
2 Remove cable CBL2106A
from J4 on PCB2100A.
3 Remove the cables CBL2125A
and CBL2102A
from the top LEDs
.
4 Remove Qty 4 screws and washers securing the main board
support to the front panel assembly
.
5 Carefully lift up on the main board support and feed the
cables CBL2105A, CBL2106A
and CBL21
12A
through the cut
out on the main board support.
COMPONENT REMOVAL & REPLACEMENT
Main board,
PCB2100A
CBL2106 connected
to J4 on PCB2100A
CBL2102A and
CLB2125A
CVR2103M
Remove 4
screws, 2
each side
4-6 SER360 A1106