EasyManua.ls Logo

NSK MEGATORQUE M-ESB-YSB2020AB300 - Operation; Preparation; Wiring Check

Default Icon
356 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
— 6-1 —
B
B
3
3
t
t
y
y
p
p
e
e
B
B
5
5
t
t
y
y
p
p
e
e
2
2
3
3
t
t
y
y
p
p
e
e
2
2
5
5
t
t
y
y
p
p
e
e
6.1. Preparation
6.1.1. Wiring Check
6. Operation
6.1. Preparation
6.1.1. Wiring Check
Caution: On completion of wiring the ESB Driver Unit, check items listed in Table
6-1 before operating the Megatorque Motor System.
Table 6-1
No. Items to be checked Points to be checked
1
Connection of main power
and Input/Output signal
cables
· Check if the wiring is properly done.
· Check if the screws of the terminal block are securely fastened.
· Check if the connectors are properly connected and secured.
2
Connecting cables
· Check if the cable sets (Motor cable and resolver cable) are properly
connected and locked to the connectors.
3
Handy Terminal
· Check if the Handy Terminal is connected properly and locked to the
CN2 connector.