Quantum GX2 microCT Imaging System Manual Chapter 2 | Safety, Warnings, and Radiation Hazards 14
PerkinElmer recommends, and some local government agencies may require, an X-ray leakage safety
test be performed under the following conditions:
Every 12 months
After a PerkinElmer technician performs maintenance or service, in which case the safety survey
will be conducted by PerkinElmer
After any abnormal condition that could impair any of the safety systems. For example, the door
becomes difficult to open or close.
See Surveying the Quantum GX2 microCT for Radiation Leakage on page 80 for more information.
Regulatory Compliance
Customers in the US are directed to check with their state radiation control program director for
registration requirements. For a list of U.S. state agencies and Canadian Provinces, see the Safe
Operating and Emergency Procedures for the Operation of the Quantum GX2 microCT Cabinet X-
Ray System document. This document was provided as part of the pre-installation instructions and is
also included on the same CD-ROM as this manual. International customers should check with their
governing bodies about possible registration or other requirements.
PerkinElmer certifies that the Quantum GX2 microCT Imaging System complies with FDA
regulation CFR 1020.40 after installation at the customer's site. PerkinElmer also certifies that the
instrument meets all of the International regulations of the country where it is installed.
WARNING! A PerkinElmer employee will conduct a radiation leakage survey and
safety tests after the Quantum GX2 microCT Imaging System is serviced by
PerkinElmer. PerkinElmer employees are trained in radiation safety. However, check
with your local radiation control authority to determine the specific radiation survey
requirements at your facility. It necessary, have a qualified expert other than a
PerkinElmer employee survey the installation before operating the instrument.