10A-139
ENGINE AND CYLINDER BLOCK ASSEMBLY
Engine/gearbox assembly: Removal - Refitting
F9Q
10A
a Remove:
-the bolt (27) from the engine fuse box,
-the nuts (28) from the engine fuse box.
a Move aside the engine fuse box.
a Remove the hydraulic clutch pipe (see Clutch cir-
cuit: Removal - Refitting) .
a Disconnect the diesel heater connector (29) .
a Disconnect the vacuum pipe union (30) from the va-
cuum pump.
a Unclip:
- the gear control cables (31) from the selector ball
joints using an open-jawed spanner,
- the gear control cables (32) from their support.
135504
136175
135565
135541