EasyManua.ls Logo

Renault F4R - Page 586

Renault F4R
993 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13B-74
DIESEL INJECTION
High-pressure pipe between the pump and rail: Removal - Refitting
K9K, and 830
13B
REMOVAL
I - REMOVAL PREPARATION OPERATION
a Remove the front engine cover.
a Disconnect the battery (see Battery: Removal - Re-
fitting) (80A, Battery).
a Remove the turbocharger outlet air pipe (see 12B,
Turbocharging, Intercooler air inlet pipe: Remo-
val - Refitting, page 12B-41) .
a Remove:
- the dipstick,
- the dipstick guide bolts (1) .
a Move aside the dipstick guide.
a Unclip the injector rail protector cover at (2) .
a Remove
- the injector rail protector cover bolt (3) ,
- the injection rail protector cover,
Essential special tooling
Mot. 1746 Offset spanner for tightening
high pressure pump pipes.
Tightening torquesm
nuts for the high pres-
sure pipe between the
high pressure pump and
the injector rail
28 N.m
injector rail nuts 28 Nm
IMPORTANT
To avoid all risk of damage to the systems, apply
the safety and cleanliness instructions and opera-
tion recommendations before carrying out any
repair (see 13B, Diesel injection, Diesel injec-
tion: Precautions for repair, page 13B-1)
IMPORTANT
Wear leaktight gloves (Nitrile type) for this opera-
tion.
135877
135878

Table of Contents

Related product manuals