EasyManua.ls Logo

Renault F4R - Page 964

Renault F4R
993 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
19D-9
ENGINE MOUNTING
Left-hand suspended engine mounting: Removal - Refitting
K9K
19D
-the scoop under the scuttle panel grille (see Scoop
under scuttle panel grille: Removal - Refitting)
(56A, Exterior equipment).
a Remove:
-the upper engine tie-bar bolts (2) ,
-the upper engine tie-bar,
a Unclip the battery wiring channel from the left-hand
suspended engine mounting (3) .
a Remove the battery wiring channel from the left-
hand suspended engine mounting.
a Fit the tool (Ms. 583) (4) onto the clutch master cy-
linder supply hose.
a Disconnect the hydraulic clutch pipe from the clutch
master cylinder by pulling on the clip (5) .
K9K, and 832
134221
135506
134486

Table of Contents

Related product manuals