44 SteelFusion Edge Hardware and Maintenance Guide
Replacing SteelFusion Edge Components Required tools
Required tools
You need the following tools and equipment to replace components:
You must use approved components for the appliance to function properly. Installation of
unapproved components will result in boot failure. To order appliance components, contact
Riverbed Support at https://support.riverbed.com.
An antistatic strap. When you replace components, you must wear a grounded ESD antistatic strap
to protect the hardware against electrostatic discharge. Make sure that the strap makes skin
contact prior to handling equipment.
A magnetic Phillips screwdriver.
Opening the bezel
The bezel on the SteelFusion Edge appliances is attached to the front panel.
MEM-1-004 32 GB DRAM DIMM 5100 “Adding and replacing memory
modules”
HDD-2-002 3.5-inch 1-TB SATA 2100 “Replacing disk drives”
HDD-2-003 3.5-inch 2-TB SATA 2200, 3100, 3200 “Replacing disk drives”
HDD-2-006 3.5-inch 4-TB SATA 5100 “Replacing disk drives”
SSD-2-002 100–120 GB 2100, 2200 “Replacing disk drives”
SDD-2-004 200–240 GB SSD 3100, 3200 “Replacing disk drives”
SSD-2-006 400–480 GB SSD 5100 “Replacing disk drives”
PWS-2-AC-1U 770 Watt PSU AC -1U 2100, 2200 “Replacing power supply units”
PWS-2-AC-2U 1000 Watt PSU AC -2U 3100, 3200, 5100 “Replacing power supply units”
FAN-2-1U-KIT Fan assembly, 1U, bank of 2x6, 12
fans with the 6 cables/connectors
2100, 2200 “Replacing fans”
FAN-2-2U-KIT Fan assembly, 2U, 1 cableless
pluggable, consists of 2 fans
3100, 3200, 5100 “Replacing fans”
RMK-2-EXPRAIL Rack kit, 1U and 2U, fully
extendable
2100, 2200, 3100,
3200, 5100
“Mounting the SteelFusion Edge
appliances using the extendable
rail”
BZL-2-1U 1U locking/hinged Bezel
Replacement Kit
2100, 2200 “Opening the bezel”
BZL-2-2U 2U locking/hinged Bezel
Replacement Kit
3100, 3200, 5100 “Opening the bezel”
FRU Description SFED Appliance Instructions