EasyManua.ls Logo

Roche 9180 - Preparing the Analyzer for Operation; Selecting Language; Start-Up

Roche 9180
186 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Roche Diagnostics
86 Instructions for Use · Version 10.0
6 Installation and shutdown 9180 Electrolyte Analyzer
Installation
Preparing the analyzer for operation
1. Selecting language
Before the analyzer is turned on, the language setting has to be selected. The factory-
set language is English.
o Remove the paper tray and use a pen to set the switch to the desired language
position as indicated on the label.
q
If you decide to change the language after the unit is turned on, you have to restart the
analyzer to activate the new language.
2. Start-up
o Find the power switch on the back of the unit and make sure that it is in the OFF
(O) position.
o Plug the power cord into the power receptacle module on the back of the unit,
then plug the cord into a grounded electrical outlet (100–240 V, 50/60 Hz).
Figure 6-11
o Push the power switch to the ON (I) position. The unit will automatically begin to
operate.
Figure 6-12

Table of Contents

Related product manuals